Factory acceptance
All solutions we implement are fully tested in-house using process simulations at both the hardware and software levels.
Once the internal testing and validation is completed, we can proceed with the Factory Acceptance Test (FAT) at our workshops.
The objective of the FAT is to ensure that all technical specifications have been met and that the product is functioning properly according to the expected standards.
Our approach is geared toward maximizing the quality of the process by ensuring that the customer has a perfect installation while reducing the risk of malfunctions and ensuring an efficient startup of the system once installed at the target site.
If necessary, Integration Factory Acceptance Test (IFAT) completes the validation phase before shipment.
- Control System FAT
- Cybersecurity FAT
- IFAT
On-site activities
Once the system has been delivered to the customer, we offer full support for on-site activities, up to final acceptance.
- System Power-up
- Loop check
- Punch point resolution
- Commissioning
- SAT (Site Acceptance Test)
- ISAT (Integrated Site Acceptance Test)
- Operator training and handover